Sudan Archive

Open the original scan

32 JOURNEY TO CENTRAL AFRICA.

races, and presents itself -like a wedge, against the force of such an immense body of water. The material is brick, faced with stone. When complete, it is intended to close the sidearches during low water, leaving only the central gateway open. By this means sufficient water will be gained to fill all the irrigating canals, while a new channel, cut through the centre of the Delta, will render productive a vast tract of fertile land. The project is a grand one, and the only obstacle to its success is the light, porous character of the alluvial soil on which the piers are founded. ' The undertaking was planned and commenced by M. Linant, and has since been continued by other engineers.

The Egyptian boatmen have reason to complain of the Barrage. The main force of the river is poured through the narrow space wherein the piers have not yet been sunk, which cannot be passed without a strong north wind. Forty or fifty boats were lying along the shore, waiting the favorable moment. We obtained permission from the engineer to attach our boat to a large government barge, which was to be drawn up by a stationary windlass. As we put off, the wind freshened, and we were slowly urged against the current to the main rapid, where we were obliged to hold on to our big friend.

Behind us the river was white with sails — craft of all kinds, pushed up by the wind, dragged down by the water, striking against each other, entangling their long sails and crowding into the narrow passage, amid shouts, cries and a bewildering profusion of Arabic gutturals. For half an hour, the scene was most exciting, but thanks to the windlass, we reached smoother water, and sailed off gayly for Cairo.

The true Nile expanded before us, nearly two miles in

Text produced by OCR — report an error