82 JOURNEY TO CENTRAL AFRICA.
races, and presents itself like a wedge, against the force oi
such an immense body of water. The material is brick, faced
with ^tone. When complete, it is intended to close the side-
arches during low water, leaving only the central gateway
open, . By this means sufficient water will be gained to fill all
the irrigating canals, while a new channel, cut through the
centre of the Delta, will render productive a vast tract of fer-
tile land. The project is a grand one, and the only obstacle
to its success is the light, porous character of the alluvial
soil on which the piers are founded. The undertaking was
planned and commenced by M. Linant, and has since been
continued by other engineers.
The Egyptian boatmen have reason to complain of the
Barrage. The main force of the river is poured through the
narrow space wherein the piers have not yet been sunk, which
cannot be passed without a strong north wind. Forty or fifty
boats were lying along the shore, waiting the favorable mo-
ment. We obtained permission from the engineer to attach
our boat to a large government barge, which was to be drawn
up by a stationary windlass. As we put off, the wind freshen-
ed, and we were slowly urged against the current to the main
rapid, where we were obliged to hold on to our big friend.
Behind us the river was white with sails—craft of all kinds,
pushed up by the wind, dragged down by the water, striking
against each other, entangling their long sails and crowding
into the narrow passage, amid shouts, cries and a bewildering
profusion of Arabic gutturals. For half an hour, the scene was
most exciting, but thanks to the windlass, we reached smoother
water, and sailed off gayly for Cairo.
The true Nile expanded before us, nearly two miles in