Facsimile · p. 546
Chapter Four On Agriculture and Irrigation Irrigation 1913 saw the lowest flood known for over a year, with the Nile's level in every province and district lower than the average of recent years. Despite this average being low, the basins in that province were never watered. A complete project has been prepared to irrigate part of the Gezira region, which includes the construction of a dam on the Blue Nile at Masqun, located 8 kilometers south of Sennar. A canal approximately 70 kilometers long will be extended. The terrain has been surveyed to determine the best location for the dam and canal. Survey and research work has been completed in the White Nile basin to strengthen it for floodwater diversion and storage by building a dam at Jebel Aulia. "Soundings" have been taken in the Nile valley at various distances between Jebel Aulia and Malakal, and the terrain has been surveyed at the proposed dam site. Work is underway on the Tokar project, which could include the Khor Baraka. The significant shortage of land cultivated in Tokar due to lack of water highlighted the need for this project. Irrigation in Kassala by means of dams and barrages on the River Gash has yielded results that inspire pride and satisfaction.
Lands, Their Survey, and Levelling Lands The Lands Department has focused on matters related to lands in cities and towns, and has made progress in the measures taken to survey and monitor their condition in the towns of the country, especially in Um Bander, Um Dawm, and Tokar. In agricultural lands, transactions were few and of little importance, but the government sold small areas, and the leasing of government agricultural lands was as usual each year. The government granted a few concessions in lands far from the Nile, notably a concession for salt extraction at Ras Rowaya and a concession for water exploration and extraction by artesian wells between the Blue Nile and Atbara to increase the cultivable land in those areas.